Posted on Oct 23, 2017

Oak City Engineering

Oak City Engineering recently visited a 1.5MW solar farm installation for troubleshooting and site re-commissioning. The site was successfully energized and connected to the Utility, producing full power when we finished on Thursday, 10/19/17. The communication was successfully established between the remote monitoring group and the onsite equipment including the inverters, reference cell, Utility meter, and weather station.