Posted on Oct 23, 2017

Oak City Engineering

Oak City Engineering recently visited a 1.5MW solar farm installation for troubleshooting and site re-commissioning. The site was successfully energized and connected to the Utility, producing full power when we finished on Thursday, 10/19/17. The communication was successfully established between the remote monitoring group and the onsite equipment including the inverters, reference cell, Utility meter, and weather station.
Get quote
Message sent. We'll get back to you soon.